Rowan Drilling
- Markets:Shipping & Transport
- Country:USA
- Courtesy of:Superior Products International
Project Description
The customer was looking for a way to reduce the temperature in the control room of one of their vessels.
Coating Solution
SUPER THERM was applied to the roof of the Control Room and the welder’s shack was primed with RUST GRIP and top-coated with SUPER THERM.
Results
After the application of SUPER THERM the surface temperature of the roof dropped by 17°C and the inside ceiling temperature dropped dramatically.
Products we used
We remain at your disposal for all enquiries you may have about our wide range of products. Have you not found the solution you are looking for, then let us find one for you.